Sunday 18 September 2016

Raft Foundation preparation and concrete pour - Sept 2016



Insulation is laid out on carefully prepared level foundation of Type1 and sand. Steel reinforcement is laid on insulation and in deeper sections under walls.




Concrete pump arrives and pumps 15m3 of concrete into raft foundation. The raft is then floated off for level and finished with a whirlpool.




Garage ceiling/studio floor taking shape.

No comments: