Saturday 29 October 2016

Wind and watertight

 Here the ply roof is completed and the large Fakro skylight is visible [1.2x2.4m].
 Bill excavated thetracks for the drains and other service ducts from the garage to the roadside, where the specialist contractor took over.
The drains were linked out to the road services - a specialist contractor dealt with the road connection for sewer, water, gas and electric. They had a permit to close the road for 2 weeks, tho actually managed to complete the work in a week. The postie was pleased to be able to walk peacefully up the road, but I am sure the rest of Banchory population was less excited.

No comments:

Post a Comment