Sunday 30 April 2017

2nd fix in progress

 

Here is the shower room fully tiled: note the neat finish to the window reveal, instead of using trims.
And here is the bathroom tiled in grey with lights showing on too, since second fix is under way for electrics.


 Studio kitchenette boxes in place:
 Utility room wall units and floor units fitted too.

Thursday 6 April 2017

Groundworks around the house

Some progress on the outside: 'railway sleeper' walls [actually they are not really railway sleepers, which are banned due to toxins, but treated timber of similar size].


 I have also been backfilling the nether side of the garage, and  putting up a wee wooden fence atop a retaining wall.
And the house now exhibits boldly its official number, tho not yet its name.

And inside I have been working on the kitchen units for the utility room, and for a triangular side extension on the main kitchen peninsula.