Monday 20 February 2017

Pre-cast exterior stairs

Here are some images of hte pre-cast stairs being offloaded from the lorry and lifted into place with a Maniscope.

 The steps are shaped to fit the gabions, which stagger back at an angle and with steps. to enable a slightly wider platform.

Thursday 2 February 2017

Roofs, walls looking finished

Here is the green roof, looking a bit patchy because they sent short by 6m2, so more is on the way. It has now been watered in, by rain and hose, so should settle in and establish itself over the next few months.

 The pink north wall with small windows
 and the front entrance wall with cladding complete
 Solar p anels installed on the studio roof, pumpoing out energy [well not much in winter months] but not yet grid connected.
 Tapoing of the plasterboard now in progress in the house
and the south wall cladding is now finished